Reaching your sustainability targets?
Find out how our flotation, thickener and analyzer services help to achieve your sustainability targets
Detect issues early for improved reliability
Inspection requires approximately 30 minutes per cell with flotation running, no downtime required. The recommended frequency of this inspection package is 3-4 times per year.
Overall detailed condition of the flotation cell
Visual and vitals inspection requires approximately 30 minutes per cell with flotation running. Mechanical verification inspection requires approximately 30 minutes (excludes drainage time) per cell during shutdown. The recommended frequency for this inspection is 1-2 times per year.
Includes additional checks and adjustments
1 hour (excluding drainage time) required to conduct the visual and vitals and mechanical verification inspections. Additional time may be required on a case-by-case basis.